work schedule – week of July 19

Just one week left before Olde Towne Festival and lots to do. We’ll install the three remaining windows today, and perhaps get the temporary plywood flooring down in the kitchen. We still need to level the ground at the rear and spread the woodchips. Randy Piazza has been cutting up the big tree limbs that were taken down, but more need to be sawn up and taken away. And we want to get a coat of paint on the kitchen walls. Bob Gloor did a nice job on one of the upstairs bedrooms, and Dan Seyler has been vacuuming  several of the major rooms downstairs. We’ll probably be working at little things right up until the first visitor arrives. Your help is needed.

By the way, we’d like to have people available next Saturday and Sunday during the Festival. You may be able to guide visitors through the house, or just be there to answer questions (and maybe sign-up new members or volunteers). A Revolutionary War re-enactor (British version) will be there Saturday afternoon, and several groups performing musical selections with Celtic, Scottish, Irish roots will perform on Sunday afternoon. No sign-up is necessary—just show up when you have an hour or so.

Leave a Reply